tracing lines.
Moderator: MADRIX Team
tracing lines.
hi there,
http://www.14dd5266c70789bdc806364df4586335-gdprlock/watch?v=REKWRVyWW4s
Im just wondering how they do the chases of the upper led structure and
at :038 they do the closing effect and the drop down raining effect on the led tubes.
any ideas would be greatly appreciated.
i have madrix basic and am ordering some leds tubes for testing soon. Some ideas of how to do traces before they come would be great thanks
Im thinking they might have a large patch and have the ceiling bit mapped to the side of the the mapped 3d vertical tubes. then they map the layered effects to the different sections.?
thanks
http://www.14dd5266c70789bdc806364df4586335-gdprlock/watch?v=REKWRVyWW4s
Im just wondering how they do the chases of the upper led structure and
at :038 they do the closing effect and the drop down raining effect on the led tubes.
any ideas would be greatly appreciated.
i have madrix basic and am ordering some leds tubes for testing soon. Some ideas of how to do traces before they come would be great thanks
Im thinking they might have a large patch and have the ceiling bit mapped to the side of the the mapped 3d vertical tubes. then they map the layered effects to the different sections.?
thanks